Tune in to hear from Contractor and Federal leaders as they discuss EFCOG’s efforts to enhance mission performance and completion across the complex. The EFCOG Exchange Podcast also features special topic episodes, highlighting digital transformation, lifecycle infrastructure management, safe and secure operations as well as other topics related to DOE’s critical missions.
Energy Facility Contractors Group Podcast
#4 EFCOG Webinar on Modernizing Operations (10/22/26)
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
EFCOG hosted webinars designed to support collaboration, knowledge sharing and consistency across the DOE enterprise as the sites begin developing their implementation plans for the newly revised DOE Orders.
Guest speakers:
Jennifer Jung - NNSA
Greg Sosson - EM
Myah Gaskins - Savannah River Field Office
Ashley Charlton - Savannah River Nuclear Solutions
BJ Quigley - NNSA
Reach out to staff@efcog.org to be added to the webinar mailing list.
Good afternoon, everyone. It's uh right at the top of the hour. So uh thank you for joining. This is a continuing uh webinar that the FCOG is sponsoring to help us uh share lessons and to ensure that we're aligned across the enterprise on the uh this this modernizing operational directives initiative that we're all involved with. So this is like the fourth one, I believe, that's uh been done. Um my name is Tim Bolin. I'm on the FCOG board and helped um help sponsor these uh these webinars along with John Longenecker. We're kind of teamed this up, so it's a good it's a good team effort here. So thank you all for joining. Um we've got a good list of our our federal uh leadership on so we can have some of their perspective today. But to be reminded that this this webinar is to have a combined form of DOE leaders and contractors to help raise issues, raise concerns, because we all have the same goal is to urgently implement uh this modernizing the directives that we've been given, uh, with the goal in mind to make sure that we're not compromising safety or security or any of our any of our uh our areas in that regard, because uh obviously that is not the intent is to gain efficiency and to focus our resources on a more efficient way to deliver the uh the um the goals that we have in our program. So so with that, that is our overall goal, and welcome today. And so what we always like to do is open up with our our NNSA DOE or science leadership that we have on. I I think um uh we have uh Jennifer. I mean, are you are you on? Are you got uh something you want to share with us today?
SPEAKER_01I am on, thank you. Uh yes, I'll just give an update where we are uh from NNSA. So right now we have five of the eight alignment plans have been approved by the field offices. Uh MO feedback has been consolidated and distributed to the appropriate NSSA organizations for review. Uh we gave two additional opportunities for feedback. So one additional is on October 30th and another on November 30th. So please work that feedback through your field offices. Uh so our initial efforts prioritize directives with the most feedback and sensitivities and significant implementation challenges. Uh, so engagement will expand as those reviews progress. Uh, organizations are evaluating uh supplemental direction, implementation guidance, and other approaches to address the feedback as required or directed in the orders. Uh so for example, NA80 is working through their nest director instructions. Uh, they've initiated an NA80 roadshow and have gone to about half of our sites. Uh, the other remaining sites are planned. Uh NA70, and I think we'll talk about it, see it a little bit later in the meeting, uh, is working through supplemental direction uh to address implementation needs on DOE order 470.7. And NAESH is working through comments. They own roughly about a third of our orders and are working through any potential NNSA solutions. Um, so next steps, we appreciate the MO community's collaborative proposed common mod data package. So those are the reporting requirements. NNSA is evaluating those and hopefully we'll uh be able to provide some feedback shortly. Uh we continue to prioritize high impact feedback, communicating the finalized guidance through established channels, and our images are encouraged to raise those implement implementation challenges, um share solutions, and route contract-specific uh questions through their sites. Uh so that's all I have today. Please let me know if you have any additional questions.
SPEAKER_04So, Jennifer, I'll I'll bring up one and maybe it's common to all the uh the rest of the site. So I understand the alignment, you're looking at the alignment plans at headquarters, working back through the field offices and the contracting officers. Is there a is there a common response that's going to go back out to the NSA contracts, or is it going to be contract specific? Is there going to be feedback to the contractor from the field office on their alignment plan individually, or are you doing that through the headquarters uh response?
SPEAKER_01So it'll go through the ACOs at the site, so the contracting officers. Um the the alignment plans were some had more detail in them that required a more detailed response. Others just kind of gave a schedule and basic implementation. So those have been approved. Uh so any feedback would be worked through the field office and the the CEOs there.
SPEAKER_04Okay, okay. Any questions for Jennifer from the field? All right, thanks. I think Greg, are you on? Do you have some comments from from your angle?
SPEAKER_06Um, yeah, I I am and uh appreciate being here. And if you don't mind, I'm just gonna share my screen. I just put a couple of talking points up. Um so I won't I won't be emailing these out because I haven't had them cleared, but I'll I'll project them how if that'll work. Uh okay, so if everybody can see my screen. Yep. Okay, good. So um to my knowledge, we haven't approved any alignment plans at any of the sites. Uh you know, similarly, any communications with a specific contractor is going to come through the contracting authority at the site. Um as we've reviewed the alignment plans, um uh we received a number of uh issue forms that we asked uh the uh the um feds and the contractors to fill out when they when they saw things. So we've uh at least at EM headquarters, uh we've been focused primarily on you know what are what issues need to be solved. Um so we got about uh as of today, we have 171 forms in. And that doesn't mean if you don't find another problem, you don't send it to us. Uh we'll we'll take more, but we wanted uh we wanted to draw a line to start you know a roll-up type review. So we're looking at that. Um we're kind of binning them. So we're looking at the ones that we believe are going to need to coordinate with other program offices uh on any of the information gathered. So if we think it's a DOE and NSA wide issue, we will, you know, uh that has to be resolved DOE-wide, uh, we will uh reach out to the other program offices. We of course want to rank them in you know what needs to be prioritized. And uh to the largest extent possible, uh, you know, where depending on the issues, uh, I would like to, you know, be able to issue internal program guidance uh that would then flow down through the sites and through the contractors. It depends on the issue, whether it's contractor specific or or you know more broad. But I I can do that relatively quickly. Um, you know, even if it may apply to other program offices, uh I'd like to, you know, keep things moving um and then go back and and you know look at longer-term solutions if needed. Um I will, you know, just one one of the big examples, I think, is you know, the the 231-1 Bravo uh for um uh was was canceled. Um so you know, we still have the requirement under 29 CFR 19041 to for the contractors to report uh issues up to the feds. Uh it's just cares is not going to be you know the required mechanism to do it. So, you know, there's there's there's a few other cases, but you know, there's processes where you know we still have to follow the CFR and we're not mandating how you do that. Um, I understand in some other program offices people might just continue using care. Um, I have no idea whether that's going to continue to be maintained or what, but uh, you know, that's one where the contractors are gonna have to ensure that um, you know, their whatever database they have is completely auditable and um you know we can we can look into the cases. It'll certainly make things more difficult to do roll-up analysis, but uh we'll deal with it. Uh the next one uh of all the order, and I we tried to um consolidate you know the number of issues. So if if multiple sites identified the same issue, we um we're trying to you know reduce that count to just get the count of one um if if something was reported by multiple sites. But as you can see, um when we look at the uh uh forms that we got, the overwhelming majority is with 470.7, um with you know where everything was rolled up into safeguards and security. Uh I know there, you know, probably one of the main concerns is you know where the mCNA order points to. Um so there's probably that's probably gonna be pretty high on the radar for us to resolve. Uh then you look, then the the probably the next big E's are you know, really, you know, 421 Delta Um on facility safety, you know, given that it no longer applies to less than Cat 3, it's probably one of the most significant ones that we're uh looking to deal with now. Um, you know, records management, uh um 425 1F for verification of readiness for startup. Uh you know, they're the ones that have the most issues identified right now. And uh obviously we are gonna need to prioritize those fairly high on the list. So um this chart shows uh what you know what types of issues we're gonna we're having. Um the the big, you know, the second or the highest bar there, the second one over is requirements gap. Next one is conflict with another requirement. So obviously, we're either going to need to change an order or preferably issue supplemental guidance to uh for for the contractors. Um, you know, then then we get into you know process needs clarity, governance and ambiguity, you know, um technical errors. It looks like we got about a baker's dozen of those, um, and then about 10 not implementable as written. I don't have the specifics on those at this point, but um uh uh that is uh you know basically where we are with uh um our roll-up review. Um and um I'm I've now got myself completely lost in team. So all right, there we go. I have too many screens open. Um so that's kind of where we are with EM. Again, uh appreciate everybody's input. We want to work through it together. And uh if uh you know FCOG's got specific priorities that they want to go look at, we're we're all ears. Um, I would not be surprised that we're highly aligned on what the things that we need to to work on because I know my staff has been talking with the the corporate staffs and the site staffs are are are are talking with the contractors and we're seeing you know a number of of common themes here. So that's that's where we are in the M at this point. Um and appreciate everybody's participation once again. Any any questions for me?
SPEAKER_04Any questions from anyone? It's interesting to see, Greg, that you had the governance question. I did have a specific topic. I was gonna talk a little bit about that. That that's and we'll I'll kind of bring that up. But one of the and on the NNSA side also is the governance question about what is going to be the ongoing governance process of the orders, how they get revised, and how that actually happens now with this large um large effort that's taken place. What now that the whole model has been really changed up?
SPEAKER_06Yeah, I I will say if if um if it needs to, if it raises to the level of needing to change an order or a directive, uh right now MA owns them. So that will have to um roll up to MA. Uh and again, um I'm willing to go as far as I can without violating an order to issue uh supplemental guidance. And also when we talked about governance and uh you know delegated authorities and things like that, one of the things not touched by project velocity was DOE order 410, which is a central uh technical authority. And uh, you know, it it's not really referenced in any of the new project um velocity directives, but if you read the 410 order, it's pretty much still applicable. And uh that means for certain exemptions and deviations, you know, we're gonna need you know, chief of nuclear safety or CTA uh approval. So, you know, even where things are delegated to the field manager uh depending on the order, it it still may need headquarters CTA concurrence at least. So so uh a lot of people didn't a lot of people didn't realize that.
SPEAKER_04Okay, good point. Any questions for Greg? Okay, um looking across, I know Meyer, you you are on from the Savannah River field office. Did you want to offer a perspective or give something from your view at the field office level?
SPEAKER_02Sure. Um I'll give a brief update on where we are as far as um the process. Our major contractors, including SRMC and BSRA, have submitted all their formal alignment plans for site and corporate review. Um we anticipate the AOC and the field office and managers approval by November 2nd. Uh following that, we expect the contractors to be implementing those changes according to the timelines in their plans. Um as far as some of the as far as the positing is going on, you know, all our optimization initiatives are currently progressing smoothly. Everything's on the schedule. Um, we haven't had any major issues so far. Um key focus areas uh moving forward is we expect um the value to be tracked. So meticulously track the gain deficiencies and the costs and savings throughout this implementation phase so that we can prove the value of the changes. I think that's really important. Um and throughout this process, even alignment and the um uh implementation, just maintaining open and transparent, uh proactive communication between us DOE and the contractor so that we can secure um continuous alignment and input. And that's all I have.
SPEAKER_04Thank you. I see Greg, you've got a question.
SPEAKER_06Yeah, thank you. Uh uh Maya reminded me of an important point that I forgot to mention. So the the uh everything I really talked about was with respect to issues that we need to solve. Um I have not received any any uh you know real input from the sites of you know opportunities for improvement and where project velocity is going to pay off. So, you know, that's something I'm I'm not seeing a lot of right now. But I mean I understand where we are and we need to to figure it out, but uh that's we're likely gonna need to be an outcome, you know, when we have further discussions with us too at the end of the day.
SPEAKER_04And um I I do have a topic that we can touch on that a little later in the agenda that will bring one example so that it'll hopefully start some conversation. John, do you see any more of our leadership on?
SPEAKER_03I'm just looking through the let me uh let me ask if anyone to raise their hand, if your honor would like to speak. Ahmad couldn't make it today. He and Jim Todd both have a conflict. He did ask to pass along that they perceived the comments, as Jennifer said. They're prioritizing four orders for you know immediate um attention, and that's 420 facility safety, 451, and 452.1, 452.2 nuclear explosives and weapon safety, and then 410 management of nuclear material materials. So that was Ahmad's uh feedback to us, and he echoed what others have said is none of us understand yet that we're working to define what the NA process or any order revisions that need to go back through the process are going to be. Anyone else from NMSA that joined us or anyone from uh EM or science or DOE or headquarters or field that have have any comments on what's working and what's not and what we should be focused on?
SPEAKER_04All right. Okay, hearing nine. Yeah, so I did have a discussion here on the governance and and I and we've already touched on it. I'm not sure how much more that we need to drive, but I will say that we recognize that that with any any large change that we're that we're seeing now and that we're putting into the system, it's gonna bring uh some questions on how to about go about and do the change process. So as with this new this new business, the the the whole um business of changing our orders and how do we revise them now when we see gaps, that that's that question right now, and how do we do that with this large uh parallel effort of looking at multiple orders that are in the system? I will say that uh FCOG is looking to sponsor a workshop with uh NNSA in November to help work through some of these as a partner to help manage and and be a uh you know to offer help and guidance in that area. Um so there's um there's efforts to go do that. But I'd I'd like to bring up is there any questions or comments around anything more around the governance? We do recognize there's some help that's needed in this area, and we're we're leaning in to assist um uh the the federal team on how to help go manage or do best. We should manage this.
SPEAKER_03Yeah, we should add, Greg, uh that's also the topic of our next partnering session with EM. We're trying to schedule the same topic of what is the new model, how do we work together to get this implemented as soon as possible?
SPEAKER_04Okay, any comments or any any input would be appreciated. You can send them to me or and we can do that. So uh one of the things that came up, uh Greg mentioned it. So Ashley, uh if you're on, uh uh she's gonna bring a short discussion of one example of of trying to lead uh to to begin the metrics discussion and in gathering data. Um it's beginning that process, but it should uh spur us on how we're doing it and to make sure that we are sharing our lessons and aligning across uh the institutions the best we can to be uh an alignment. Each site will be different, we recognize that, but there will be common commonality on how we measure. So, Ashley, are you all?
SPEAKER_00Yes, sir.
SPEAKER_04Take it away.
SPEAKER_00All right, so good afternoon, everyone. Uh beginning of the month, um, I had the opportunity to host uh eight of the PAs and DAs to discuss um a standardized data package for the quarterly progress reporting. Uh we started off the conversation in our letters of direction where um it was prescribed to us that we would provide um quantify, we would quantify the resources recovered in streamlined processes, cost efficiencies, scope gains, schedule acceleration resulting from the changes of these directives. So we had put together uh three categories for reporting, streamlined processes, uh staffing optimization, and schedule acceleration. Uh following each of those categories, we would um put forth a description of the change. So what in the process changed for the streamlined process, a quantified result. So were there fewer steps, were there um uh a number of events or activities removed? And then the third um column that we would put forth for that particular category is um plans reallocation and scope gain. Uh one thing that was pretty unified across the board was scope gain as a separate uh category, reporting category, um, wasn't didn't seem appropriate to um the DAs and PAs because uh the goal of this is to essentially take these resources, these streamlined processes, um, some FTE and reallocate them towards direct mission. So the scope gain would actually be within um the changes being made. So we made that as a as a third reporting column. Um so one thing that we saw across the board was that a lot of this is going to be FTE reallocation and not necessarily hard cost uh savings. So uh we agreed that the reporting metric for any um FTE saved would be reported in hours to be unified, uh uniform across the the enterprise. Um and so that's that's one of the things that we came to. Uh each lab plant site would report separately. We've maintained this summary as a cumulative total, not um uh so intending to put forth realized implementation. So if a site hasn't yet implemented um something, they wouldn't report it on their quarterly report. Uh hard savings would more likely be in reduction of material costs or subcontract costs, and that would be put in the streamlined process category. Um all cost savings would be conveyed as unburden rates. And then so we would utilize our um current reporting processes and metrics um for um departments such as or organizations such as safety and security measures. So um try and you utilize the processes that we have as much as we can um to essentially uh report these these metrics. Uh we revisited the minimum data package slide that Jennifer had set out um to the group. And so we used that as kind of um a basis just to make sure that we were on the right track for this um the minimum data requirements. For the most part, we were um very much in line with that um center section that was prescribed. Uh, we did see a need to streamline a little bit. Um anything less than quarterly seemed a little bit um uh burdensome to do. Um nobody is anticipating um counting heads that are moved in the organization or counting down to the exact number of FTE that that we're saving. Um so it's it's uh the I'll talk about concerns in a minute, but we we mostly stayed on track with um the minimum data requirements, but um again try to streamline it a a little bit than what we were given. So um moving on to some concerns um that seemed to be um pretty again uniform across all of the sites was um over burden burdensome metrics process. So um the whole idea behind this initiative is to try and streamline as much as practical and and utilize FTE um on direct mission. So there was a concern for um dedicate having to dedicate personnel to tracking this effort in particular, and at what point would we stop reporting? So um, for example, for I can speak for SRNS is that we plan on there's uh a projected savings. For example, I'll bring up 2S drills. 2S drills are no longer required. Um, we plan on utilizing drills for um maintaining proficiencies. And if there's ever uh a need or uh for improving performance based on evaluations, then we would do so. But uh so there's likely to be a um a less frequent basis for for drill. So over, and that would be estimated, so over a year for round numbers, um, a hypothetical is if we saved 24 drills a year, uh, we no longer execute the 24 drills. Um instead of uh being able to report that we estimate an annual savings of 24, we're being required to report on a quarterly basis. And so every quarter I would just put forth that we estimated a um a savings of six drills this quarter, and it would be uh consistent across the next quarters as we move forward, unless there's some drastic change that we didn't anticipate implementation um assisting with it pretty immediately. So that that number would change pretty quickly if we realized something different. Um so at what point after implementation um would we relax the reporting requirements for processes and insights and whatnot who have completed implementation? Um and then something that was actually mentioned in this meeting is um um essentially we anticipate there there will be no contract cost savings because we are reallocating it back towards mission. So uh being able to communicate what that should look like and what actually happened. So um being able to use some kind of level two, level two schedule reporting or milestones being accelerated and and realized sooner than scheduled. Um those are the types of things that we as CITES as SRNES would anticipate seeing due to strategic reallocation of resources rather than being um rather than meticulously reporting on on metrics on a on a frequent basis. So um so for example, um we may be able to for lessen the number of CGDs that we are executing. Therefore, um right off the bat, we should be able to run down our CGD backlog and then potentially reallocate some resources back to design engineering on that support um direct mission scope. So that is an example of something that would happen, but um to prescribe a metric to that uh would be difficult. Uh so those are some of the concerns that have been brought up. So I will stop there and see if anybody has any anything to add or any questions.
SPEAKER_04Well, let me ask you first. So thank you for that summary. I again, that's you're in process, I understand, but you wanted to give an insight to where you're moving and leading some of the other discussions around the complex. Do you mind putting some of that in the chat so everyone can have advantage or have advantage of seeing some of the data you're talking about or some of the suggestions? Would that be doable?
SPEAKER_00Yeah, of course. Okay, yeah, I think I can I can try and do that. Yep.
SPEAKER_04Any questions for Ashley?
SPEAKER_03Just a comment from me. Ashley, great job on that. And I I think as we we keep asking that question of the Depth Sex office and MA, what are you gonna roll these up, you know, to report to the Secretary and to the White House and to Congress? And I think what you're doing is right along that line. And they they say it slightly differently, and that is, you know, the the man hours, the man hours saved, and then the accelerated milestones. And then the one that's a little tougher, but it's related, uh, is what additional scope are you able to take on? So I think in in that case, it's you could advance as you're accelerating the schedule. Obviously, you're able to to uh execute certain steps in your programs and your missions faster, but defining those is very important to them so that they can articulate it. And then the other one that Jim McConnell raised uh last week was can we give them any examples of where safety, security, or quality has actually improved uh in our metrics, at least not decrease, but can we give them any metrics, if possible, where with this fine attention, much more focused attention on risk management, risk elimination, uh can we give them examples of where those metrics at the various sites have improved? So that's I think what you're doing is great. And as we fine-tune the feedback depending on the audience, because at the end of the day, this has to roll up to OMB and Congress who approve our budgets. I think what you're doing is is very critical to continuing this.
SPEAKER_06Uh yeah, so um I I certainly appreciate that discussion. And uh, John, to your point about you know, at what point are we gonna do roll up to you know seventh floor and and higher? Um, I I want to be in a position where I'm pushing information rather than waiting for it to get pulled. Um I I don't have a milestone where somebody's gonna pull, but I I don't want to wait to be told. But I'm certainly not gonna push um um push until I have you know an accurate story to tell. So that that's kind of the the the first one. So um sooner rather than later is the bottom line for that. But the the other piece around you know, the examples of um, and this is where I would just ask for caution if we say, hey, we're not doing six drills a year, um you got to be able to answer the so what test. Like, so how is that not compromising safety? And congratulations, you're now spent X person hours less in drills. What are you now getting because you're not doing that? So um if if the message is we're not doing six drills a year, then you know there's got to be a follow-up, other it's the other other that you know, otherwise you're open to the broad side of well, you're decreasing safety. So great point. That those are my thoughts. Yeah.
SPEAKER_00Yeah, yes, sir, absolutely. So the um in that one in particular for planned reallocation or scoping. So the unique aspect of our site is having the the three site tenants um are whenever they are feel our fire department also has to um participate in their drill sets too. So they are widely taken up um pretty significantly by drills every year. So they actually have other training and other things that they could be improving upon. Um so that would be part of what would be in the scope game. So um understood, sir, and and um I have that noted. Thank you.
SPEAKER_04That that let me let me comment on it. That's a very good example of how reality is putting the risk, putting the focus back on the real risk versus you know the the the perceived risk of area. So thank you for that. Is there a question from Jeanette? Or is that um all right? Any other questions on on the metrics? Thank you, Ashley, and um I'm sure there'll be a lot of conversation as we go forward now that we're starting the that discussion across all of our models. Um all right, um Jay, anything on the working group? I know there's some move afoot to guideline the the working the working plans or the yearly plans around helping with this initiative.
SPEAKER_05Yeah, actually, we had a call with all the chairs today, and uh they're finishing up their touches on the fiscal year 27 work plans. And as part of that, uh the the order revision will factor in uh to their work scope. So they're looking for those areas where they can have discussions internally about where we can take advantage uh with the the streamlined orders to gain efficiency. So they'll be coming up with ideas and and sharing those among the sites. Uh where appropriate, we're looking for those areas where uh the subject matter may be a good topic for a workshop. We have two workshops right now planned for November, one on NQA1, and the project delivery group is doing one on risk management. So I think the the working groups will be pretty active uh in this order revision area uh in the workshop that they do over the next year.
SPEAKER_04Thank you. Communications, uh I know there's lots of stakeholders out and there's lots of questions or are questions starting to form up. Are there any discussions around our stakeholders or our our uh communications that we need to that the FCOG needs to help with in terms of managing comms or helping uh develop comms or address comms where there's lack of communication?
SPEAKER_03Well, one of the things we might just raise um of that we've heard, and just to stimulate some conversation, FCOG has quarterly calls with Defense Board and GAO, and of course in talking to them, their concerns are and they Defense Board actually told us that they have on their website and we can go look at the 22 orders they're focused on, uh, including explosive safety state conducts of opt incident reporting. And one of the concerns they had was if we have removed reporting requirements from an order or eliminated in an order, how do we know those basics are covered? And our answer to that was well, you know, the risk at each site determines that reporting and that documentation, and that'll be in our internal procedures. But that's something they said they wanted to follow up on is how are we going to do differing professional opinions, occurrence reporting, and the like. And then uh they too asked the same question, interestingly, who's now in charge of revising the orders in DOE? And could we get an organization chart on uh office of management? The other thing that they were said they're going to look at, and this is just verbatim from them, is uh looking at how we're consistently interpreting the orders uh for the same, you know, the same hazard at the various sites. That they said there was some inconsistency in the past, no surprise at that, but that's something that they're going to uh going to look at. GAO said they're interested in um knowing as an enterprise how EM and NSA that they mainly look at are going to manage this. What is the management model going forward with a governance model? What are the metrics for reporting uh improvements? And then they also discussed uh how are we training uh our uh people in the new way of doing business so that make sure that everybody understands the the new orders and their role in them, or where to go and get an answer if they don't know that already in the organization. And then the final one for them was the proof is in the metrics you send us and how you spend the money. And interestingly, we you know, like Congress has been criticizing DOE for years. This is your chance to actually step up and give them some tangible results. So interesting feedback from them. Um, DNFSV, more skeptical. You know, tell me how you're gonna do this, tell me roles and responsibilities, and uh tell me your gaps. But um I think a good thing in GAO said they were gonna, and Defense Board both were gonna follow up with you, Greg, and with uh Jennifer and with uh I guess Sean Mooth and others in NNSA and EM to have that same discussion. But I think it's just an opportunity to tell our story, but it all comes down to we're not gonna compromise safety and we are really gonna accelerate the mission. So that's the feedback we've gotten in the last two weeks.
SPEAKER_04Okay, any other comments or questions on the comms? So on the on the continuing actions, we we we did get a list of as John said, there's continuing uh ESH uh NAESH focus on several orders, but from the last meeting specifically, uh this this the supplemental directive for 470.7 i it it's it's still in follow-up. I don't know a specific action. I don't think uh Ahmad gave us a specifically where it's at, John, but it's it's still in his shop. Um we don't have it yet, we don't have the draft, so that's still being worked, unless you have something different than I have, but that's that's where it's at. Um there was a I'm sorry, go ahead.
SPEAKER_03No, that's the same.
SPEAKER_04Okay. And there was a question last meeting from Jeff Stevens on specifically 420.1D and AHJ delegation and liability. So I asked the working group lead on that to get the follow-up through FCOG to to go help uh see if there's some help, and that they they've engaged and they're working through that. So this is a question about where does delegation or where does the liability there's a liability question, so um that's actually being worked. Are there any other questions or specific actions on orders that we've other than what we've mentioned that we need to go take action and for this team to to work with? Okay, okay. Um, and any now open it up to any anything. Is there any other concern, any other question or topic we'd like to bring up on our next webinar? We want to make this useful um and uh want your input. You can actually put it in the chat or you can talk now. If there's any input or topic or agenda item you'd like to see put on here, um please let us know. Uh, we're gonna continue these. It's important for us to help to work through this. Uh, this is important for the the mission, and we're gonna uh do our best to make sure we're integrated and discussing this across the enterprise.
SPEAKER_03And we will send to all of you uh the revised talking points and I guess another part of communication that I miss, and I apologize for this, but particularly with DNFSB and Congress and GAO and everyone on the outside, they're saying, let's talk about project velocity. And as Tim said, kicking this off the last two times, uh, you know, the NNSA, EM, the Secretary's office at all said, this is a risk-based approach to increasing operational efficiency to maximize emission. So that operational efficiency is really the term we ought to be using. Project velocity was one step in that, and as again, Tim said, so well, we've been at this in NNSA and EM for at least five years, and this is just the next step in that iteration. So it's not like this is not something totally new, but rather just an extension of it. And the revised orders are really, really going to turbocharge our ability to uh to do the work. When we send you these talking points, the change since the last time is the one that we put in to respond to the defense board, that is eliminating burdensome reporting requirements like on incident reporting doesn't mean it's not important. We're still going to do it. We're gonna have very clear, timely reporting to our management at the sites, to our federal counterparts, but then we're gonna put those resources that we used to use for ORPs and other reporting into actually fixing the problem so that rather than you know forming committees and looking at these things for weeks or months, we're gonna try to figure out what's wrong, keep the people safe, get back to normal operations as quickly as possible. So kind of turning the the uh um point into this is this is much more focused on safety, security, and quality than the way we used to do it. And this is gonna free up a lot of resources. Same with project reporting. So look for that. It's on the second page of this. Uh and if if there are any that you're hearing that you think we've missed, let us know. We'll revise it and we'll uh send it out to you.
SPEAKER_04Thanks, John. Um, if there's no other comments, uh we'll reconvene. I think the uh the the invite has already gone out for November the 4th. Uh so looking forward to that. If there's any input or any any ideas ideas that we need to talk about, please uh just send them our way. Thank you. Thank you for your time. And thank you for watching.
SPEAKER_03Thanks, everyone. Stay safe. Thank you. Thank you.